HOME / NEWS / HOW-TO-INSTALL-A-LINE-ARRAY-SYSTEM-WITH-A-FRONTAL-LOADING-LIFTING-TOWER / EN
February
AT Series consists of a wide range of frontal lifting towers, suach as AT-04, AT-05 and AT-06. They are made of steel, available in silver and black colours (reference with B) and compatible with the accessories: AC-552, AC-565 and AC-569.
This Series, as well as HERCULES Series, are different from MEGARA and ELV Series, because they lift the load frontally and from the floor. Besides, and among the others different elements that you can see in our catalogue, these lifters include a transport handle and a roller system to move them vertically and horizontally, protecting also the cable and the winch during transportation.
The installation of a line array onto the tower is very simple and it is the same way for every AT Series lifters, so you can follow the same procedure for any of AT lifting towers. In this case, we have used the AT-05B frontal lifting tower and the AC-569 accessory, a support for line array systems up to 250kg. The steps to follow shown in the video are the following:
Line array installation with the AC-569 accessory
Assembly of the line array
Line array lifting
To disassemble the line array and lower the tower, simply reverse these steps, always starting with the last bar that has been raised.
In this video we have shown how to install a line array onto a frontal loading lifting tower, but as we mentioned earlier, these lifting towers can also raise trusses and LED screens.
If you have doubts, ask our commercials. They will help you with the best suited accessories for your AT frontal loading lifting tower!